Guide

EEDI and EEXI: Design Energy-Efficiency Indices

EEDI sets a design-efficiency limit for new ships. EEXI applied a similar one-off check to existing ships from 2023.

← Glossary and guides · Last reviewed 2026-11-08

In brief

Both indices estimate the CO2 a ship emits per tonne-mile by design, under standard conditions, based on installed power, specific fuel consumption, capacity and reference speed.

EEXI compliance options

  1. Engine or shaft power limitation (EPL/ShaPoLi): a sealed, overridable power cap. This is by far the most common route. It lowers the reference speed used in the calculation.
  2. Energy-saving devices: propeller upgrades, ducts, fins, air lubrication, wind-assisted propulsion.
  3. Fuel change: a lower-carbon fuel lowers the CO2 conversion factor.
  4. Re-rating or derating the main engine.

How EEDI and EEXI relate to CII

EEDI and EEXI are design checks, done once (or at major conversion). CII is an operational rating, done every year. A ship can pass EEXI comfortably and still be rated D or E if it is operated inefficiently.

Recent developments

Note for conversions and newbuildings

A major conversion can trigger a new EEDI assessment. Check with class early whenever a conversion changes capacity, speed or the propulsion plant.

Sources

Editor's note: the 2013 EEDI start date, the EEXI compliance options and the major-conversion trigger are from general regulatory knowledge. Confirm with class guidance before publishing.

Related terms

For information only. Check the official text before relying on it for a contract or compliance decision.