Short notes on newbuilding orders and the rules ahead.

A monthly read of our own orderbook data and regulatory watch list. Facts from public sources, with the caveats stated.

No. 1 · November 2026 · Orderbook snapshot of 8 Nov 2026

Tankers lead, Chinese yards take most of the work, and few orders name an alternative fuel

Between 7 September and 5 November 2026 we logged 28 orders for 100 ships from public reports. This is the set we have checked and approved, not the whole market, so read the shares as a sample.

100

ships in 28 orders

55

tanker ships — the busiest segment

71

ships going to Chinese yards

2 of 28

orders name an alternative fuel

Ships by segment

Tanker55 ships · 17 orders
Bulk carrier27 ships · 6 orders
Container18 ships · 5 orders

Ships by yard country

China71 ships · 19 orders
South Korea12 ships · 4 orders
Not disclosed11 ships · 3 orders
Japan6 ships · 2 orders

Orderbook analysis

Tankers are the busiest segment

Tankers make up 55 of the 100 ships (17 orders), ahead of bulk carriers (27 ships) and container ships (18). They range from 28,000 DWT stainless-steel chemical tankers to VLCCs — 13 VLCCs across five orders. Where a price was reported, VLCCs came in at USD 108–133.5 million per ship.

China builds most of it

71 of the 100 ships go to Chinese yards, 12 to South Korea and 6 to Japan; the yard for the other 11 was not disclosed. Hengli Heavy Industry alone appears in five orders. For owners, that concentration is a reason to look hard at yard capacity and supervision resources before signing.

Alternative fuels are rarely named

Only 2 of the 28 orders state an alternative-fuel capability: six 13,650 TEU LNG dual-fuel container ships for Yang Ming at Hanwha Ocean, and two methanol-ready MR tankers for Leonhardt & Blumberg. Most reports do not mention fuel, so this undercounts. Ships delivering in 2028–2030 will still trade through the FuelEU steps of 2030 (−6%) and 2035 (−14.5%) and face the full EU ETS from their first year — fuel flexibility belongs in the specification.

Product tankers and VLCCs make up the tanker count

Of the 55 tankers, 18 are MR-size product or chemical tankers (around 50,000 DWT), 12 are LR2s (about 115,000 DWT), 13 are VLCCs, 10 are stainless-steel chemical tankers of 28,000–40,000 DWT, and 2 are Suezmax options at Hengli.

Bulk carriers: Ultramax and Kamsarmax

The 27 bulk carriers split into 12 Ultramaxes, 11 Kamsarmaxes and 4 Newcastlemaxes of 210,000 DWT at New Times Shipbuilding — all at Chinese yards.

Containers: big ships in Korea, feeders in China

Of the 18 container ships, the eight largest (13,650–14,000 TEU) are split between Hanwha Ocean and Hudong-Zhonghua. The rest are 3,000–3,100 TEU feeders at Chinese yards and four midsize ships at Imabari in Japan.

Delivery slots run to 2030

Where a delivery date was reported, most ships deliver between 2028 and 2030; the earliest are four VLCCs at Hengli due from May 2027. For 43 of the 100 ships no delivery date was given. Owners ordering now should expect slots in 2029 or later at the busiest yards.

Firm orders and reports

14 of the 28 orders (55 ships) are reported as firm, 13 (43 ships) are reported without confirmation, and one is an option for 2 ships. We count them all, but treat the unconfirmed reports with care.

How we compile these notes

Sources. Orders come from public news sources. Each order is added to our orderbook only after review, and every order links back to its original report.

Period and counting. This issue covers orders reported between 7 September and 5 November 2026, from our snapshot of 8 November 2026. Firm orders, unconfirmed reports and options are all counted, and labelled as such.

Limits. We do not have yard order books or broker data, so the shares are indicative, not the whole market. Fuel type is often not reported, so alternative-fuel orders are undercounted.

Reported prices per ship

Sorted by date reported, newest first.

ReportedOrderShipyardPrice per shipSource
5 Nov 2026Navios Maritime Partners
2 × MR2 product tanker
UndisclosedUSD 45.6mSplash247 ↗
4 Nov 2026Torm (50:50 joint venture)
8 × LR2 product tanker
UndisclosedUSD 46mSplash247 ↗
2 Nov 2026JP Morgan (shipowning vehicle)
2 × VLCC
Hanwha Ocean (Geoje)USD 133.5mSplash247 ↗
21 Oct 2026Eurodry
3 × Kamsarmax bulk carrier
Hengli Heavy IndustryUSD 37mBanchero Costa via Hellenic Shipping News ↗
30 Sep 2026China United Lines
2 × container ship
Hudong-Zhonghua ShipbuildingUSD 150mBanchero Costa via Hellenic Shipping News ↗
18 Sep 2026Hengli Group
4 × VLCC
Hengli Heavy IndustryUSD 108mBanchero Costa via Hellenic Shipping News ↗
18 Sep 2026Wooyang Shipping
4 × Newcastlemax bulk carrier
New Times ShipbuildingUSD 108mBanchero Costa via Hellenic Shipping News ↗
18 Sep 2026Venergy Maritime
2 × Suezmax tanker
Hengli Heavy IndustryUSD 86mBanchero Costa via Hellenic Shipping News ↗
18 Sep 2026Columbia Shipmanagement
4 × MR product tanker
Chengxi ShipyardUSD 42mBanchero Costa via Hellenic Shipping News ↗
Full orderbook (free toolkit) FuelEU and EU ETS guides

Coming next

No. 2 — after the IMO Net-Zero Framework session

Late Nov / early Dec 2026.

Archive

No. 1 — November 2026

Tankers lead, Chinese yards take most of the work.